Robotics — all categories

Collaborative & industrial robots · Primary: EN ISO 10218-2

Industrial Robot and Robot Cell Compliance

Robot OEM requirements (ISO 10218-1) and system integration (ISO 10218-2): fencing, interlocks, ESPE, reduced-speed modes, and cell-level validation.

Built for: Robot cell integrators, welding/palletising/machine-tending builders, and end users

Industrial robot arm inside a fenced robot cellEN ISO 10218-2
Fenced does not mean finished: teaching, maintenance entry, and restart logic are where cells are won or lost.

What this category actually demands

An industrial cell is assessed as a system under ISO 10218-2: fencing and interlocks, ESPE positioning, reduced-speed teaching, restart logic, fixtures, and the parts and tools inside. The robot OEM’s certificate covers the arm. Everything your customer’s auditor walks around belongs to the integrator.

Safeguarding concept based on the cell layout (entry points, muting for material flow, safe teaching inside the fence), with safety functions validated to ISO 13849-1 before commissioning sign-off.

Articulated / SCARA / delta / Cartesian robotsWelding, painting & machine-tending cellsPalletising & press-tending cellsMulti-robot lines & fixtures

Reality check

Where Industrial Robots & Robot Cells programs stall

01

Teaching mode treated casually

Reduced speed (T1), enabling device, and who may teach — designed and trained, or it becomes the incident report.

02

Material flow punches holes in guarding

Conveyor openings and pallet entry need muting/blanking designed to standard, not a scanner “turned down” at startup.

03

Restart logic surprises operators

Automatic restart after gate closure is a classic finding. Deliberate, visible restart is designed in from the start.

Safety architecture — Industrial Robots & Robot Cells

Reach envelope bounded by safety-rated limitsSLS · SLP · STO · Monitored stop — validated, not brochure values

Safety architecture

Each function below is a claim in the technical file, with a target performance level, an implementation and a validation method.

Perimeter & interlocked access

Guards to ISO 14120, interlocks to ISO 14119, safety distances to ISO 13857.

ESPE & muting

Light curtains/scanners positioned per ISO 13855 with justified material-flow muting.

Reduced-speed teaching

Enabling device + SLS inside the cell, with mode selection that cannot be confused.

Deliberate restart

Reset outside the hazard zone with full visibility of the cell interior.

Scope: concept to site acceptance

Four stages. Design authority stays with the manufacturer; Hazloc Labs manages compliance through labs, assessors and customer EHS reviews.

Gate 1

Domain & classification

Where it operates, who is exposed, which laws and type-C standards apply, before any test is booked.

Gate 2

Risk & safety architecture

ISO 12100 assessment turned into safety functions with PL/SIL targets for controls implementation.

Gate 3

Validation

Measurements and tests on the real configuration — payload, speed, workpiece, ground — that close each safety claim.

Gate 4

File & acceptance

Technical file, DoC/DoI, instructions, and the site/customer acceptance pack, with change control that keeps it valid.

What you receive

  • Cell boundary & operating-mode definition
  • Safeguarding design review (guards, ESPE, interlocks)
  • Safety-function PL/SIL allocation & validation
  • Teaching / maintenance safe-work inputs
  • Integrator technical file & DoC

Standards, in context

Applicable editions and clauses follow from product classification and target markets — EU Machinery Regulation (EU) 2023/1230, UK machinery rules, or North American OSHA/ANSI expectations, layered with EMC, electrical, radio, and battery law where your product triggers them.

Go deeper: EU Machinery Regulation basics for robot cells →

EN ISO 10218-1Robot manufacturer safety requirements
EN ISO 10218-2Robot systems & integration
EN ISO 13857 / 13855Safety distances & safeguard positioning
EN ISO 14119 / 14120Interlocks & guards
ANSI/RIA R15.06North American industrial robot safety

Industrial Robots & Robot Cells FAQ

OEM robot is certified — is our cell done?+

No. ISO 10218-2 integration, cell safeguarding, and the final application risk assessment remain.

Book a scoping call

30-minute call covering operational domain, applicable standards and evidence gaps, at any stage from concept to customer audit.

Book Free Call