Intentional radiators
Radio approvals that clear customs and stores
FCC, RED, ISED, MIC, ACMA, and multi-country radio paths for modules, hosts, and custom radios — including antenna and SAR considerations.

What this engagement covers
We determine whether you can leverage a modular grant or need full radio certification, map bands and power limits, manage RF testing and TCB/notified-body filings, and keep host integration, antenna gain, and labeling from blocking launch.
Best fit for
- IoT products using Wi-Fi, Bluetooth, Thread, Zigbee, LoRa, or UWB
- Cellular (LTE-M / NB-IoT / 4G/5G) trackers and gateways
- Hosts integrating pre-certified modules that still need host evidence
- Multi-radio devices needing concurrent transmission analysis
What's included
- Module vs full-device certification strategy
- Band / power / duty-cycle applicability map
- Antenna, layout, and modular integration checklist
- RF test plan (conducted + radiated + DFS when needed)
- TCB / Notified Body / ISED filing coordination
- e-label, FCC ID / IC ID / CE RED documentation package
Product types we support
Scope changes by product architecture — these are the classes we regularly take through this pathway.
Wi-Fi / BLE IoT sensors
Battery or mains sensors, beacons, wearables
Smart home hubs & routers
Multi-radio concurrent operation
Industrial wireless gateways
Wi-Fi + cellular + Ethernet edge devices
Cellular trackers & modems
LTE-M, NB-IoT, Cat-1/4, 5G modules
Short-range proprietary RF
Sub-GHz, LoRa, proprietary ISM
UWB / radar / sensing radios
Specialized intentional radiator paths
Technical categories
Radio technologies we regularly scope
Host vs module decisions
Regions & schemes
Market access is scheme-specific. We map filings and evidence to the regions you actually sell into.
United States
- •FCC Part 15C / 15E
- •Part 22/24/27 (cellular)
- •TCB Grant of Authorization
- •FCC ID labeling
Canada
- •ISED RSS series
- •IC certification / SDoC as applicable
- •ISED ID
EU / UK
- •RED 2014/53/EU
- •UK Radio Equipment Regulations
- •Notified Body when required
- •DoC
Japan
- •MIC / TELEC radio type approval
Australia / NZ
- •ACMA / RCM radio
China & others
- •SRRC
- •NCC, KC, IMDA, etc. as needed
Directives & regulations
2014/53/EU — Radio Equipment Directive
Spectrum, EMC, and safety for radio products
FCC 47 CFR Part 15 Subpart C/E
Intentional radiators / UNII devices
ISED Radio Standards Specifications (RSS)
Canadian radio certification
Key standards
| Standard | Focus |
|---|---|
| EN 300 328 | Wideband transmission systems (2.4 GHz) |
| EN 301 893 | 5 GHz RLAN |
| EN 300 220 / 300 330 | SRD — short range devices |
| EN 301 489 series | Radio equipment — EMC |
| EN 62311 / EN 50385 | RF exposure / EMF assessment |
| IEEE / 3GPP (as referenced) | Protocol-specific radio conformance when required |
| FCC KDB guidance | TCB procedures, modular approval, SAR/RF exposure |
Marks & program keywords
How we work
One clear path from classification to market-ready evidence.
Classify
Radios, bands, modular options, host role
Evidence
Module grants vs full RF testing
File
Lab + TCB / NB / ISED submissions
Maintain
Change control when HW/FW/antenna shifts
Engineering notes
Modular approval is not automatic: antenna type, gain, co-location, and enclosure changes can force additional testing or a new filing.
SAR / RF exposure is assessed by use-case (body-worn, handheld, mobile, fixed) — we define the exposure condition before quoting labs.
Correct approval path per SKU
Cleaner modular filings
Fewer host-integration surprises
Ready to scope RF / Wireless?
30-minute consultation with Hazloc Labs — bring your product type, target markets, and any existing reports.
Book Free CallRelated services

CE Marking & UKCA
Directives, harmonized standards, testing coordination, and technical documentation — handled end to end for EU and UK market access.

EMC Compliance
Emissions and immunity strategy across residential, commercial, and industrial environments — before you burn expensive chamber days.

Product Safety (UL / CSA / IEC)
UL, CSA, IECEE CB Scheme, and IEC/EN safety standards — construction review, critical components, and NRTL project management.